Power Production Leader (Working in Ha Tinh)
Erreur
☞ CÔNG TY TNHH NHIỆT ĐIỆN VŨNG ÁNG II
Vue: 171
Jour de mise à jour: 12-04-2024
Localisation: Ha Tinh
Catégorie: Direction Electrique / Electronique Production/Opération
Niveau: Trưởng nhóm / Giám sát
Salaire: Cạnh tranh
Éducation: Đại học
Expérience: Trên 10 Năm
Description de l’emploi
* Work location: Vung Ang Economic Zone, Ha Tinh Province, Vietnam
* Job type: full time permanent
* Employee type: local Vietnamese
POSITION SUMMARY
The Power Production Leader is responsible for directing all operational aspects of the coal fired supercritical power plant. He assists in the selection, training, and management of Operations Department personnel for the reliable, efficient, safe, and environmentally compliant operation of the plant. He fosters a team spirit by coordinating Operations Department activities with other plant departments.
PRIMARY RESPONSIBILITIES
Duties and responsibilities for this position include but are not limited to the following:
- Assists the Operation Manager to Develop, implement and direct the policy, procedures and practices required for the safe, efficient and reliable operation of the power generation systems and equipment.
- Oversee plant operations and dispatch in accordance with utility requirements and according to the provisions of the Power Purchase Agreement.
- Establishes and implements the training program for the Operation Division.
- Ensures that all operations personnel are adhering to safety and environmental regulations and facility policy.
- Establish and maintains plant operations data recordkeeping, including operating logs, trend logs, chemistry logs, and reports pertaining to environmental regulations and operations.
- Assists the Operation Manager to prepare one-year, three-year, and five-year Operational Plans and budgets, integrating operational activities with the Maintenance Plan.
- Prepare periodic reports and perform other duties as assigned by the Operation Manager.
* VAPCO is a fair Employer. We do not require any recruitment fees from the candidate and do not collect applications from broker individuals or organizations who charge commissions/ fees from applicants. We thank you all candidates, but only the shortlisted will be contacted for interviews.
* Candidates are encouraged to visit our website to understand about us.
Exigences de l’emploi
EDUCATION, EXPERIENCE AND GENERAL REQUIREMENTS
- A Bachelor’s Degree (mechanical, electrical or other engineering) is required.
- Must have at least 10 years of experience of a thermal power plant industry including the followings.
– Have a thorough knowledge of supercritical coal plant in 5 years of those years.
– At least 3 years of experience in a management position of the thermal power plant industry.
- Available to work overtime and/or weekends if required.
- Prefer a certificate of completion for training courses on Super critical Coal power plant such as Turbine, Boiler, Generator or Efficiency of power plant.
- Prefer a certificate of completion for training courses on Process Control such as PID tuning, the basic principle of instrument sensors (pH, DO and O2 meter) and the basic measuring theory of local instruments.
- Possess business level communications skills in English (written and verbal) and be computer literate. Able to communicate/discuss any topic in the business environment.
CV in English
Bénéfice d’emploi
- Laptop
- Xe đưa đón
- Chế độ thưởng
- Chăm sóc sức khỏe
- Đào tạo
- Nghỉ phép năm
Date limite: 12-05-2024
Cliquez pour postuler pour un candidat gratuit
MÊMES EMPLOIS
-
💲 10 - 12 triệu⏰ 24-04-2024🌏 Nghe An
-
💲 7 - 10 triệu⏰ 24-04-2024🌏 Nghe An
-
💲 12 - 15 triệu⏰ 03-04-2024🌏 Nghe An
-
💲 Thương lượng⏰ 27-03-2024🌏 Ho Chi Minh
-
💲 Thương lượng⏰ 27-03-2024🌏 Ho Chi Minh
-
💲 Thương lượng⏰ 27-03-2024🌏 Ho Chi Minh, Binh Duong, Can Tho
-
💲 Thương lượng⏰ 27-03-2024🌏 Ho Chi Minh
-
💲 Thương lượng⏰ 27-03-2024🌏 Ho Chi Minh
-
💲 Thương lượng⏰ 27-03-2024🌏 Ho Chi Minh
-
💲 Thương lượng⏰ 27-03-2024🌏 Ho Chi Minh